2.8 KiB
2.8 KiB
Handoff Report — Implementation Track Orchestrator Succession
Milestone State
- Milestone 1: Planning & Scope: DONE
- Milestone 2: Backend & DB: IN-PROGRESS (Implementation completed but failed validation review/challenge gate. Needs fixes for route logic, validation schemas, and MCP tool schemas).
- Milestone 3: Frontend & UI: PLANNED
- Milestone 4: Monorepo Build Verification: PLANNED
- Milestone 5: E2E Integration: PLANNED
Active Subagents
- None (All subagents completed or failed/stopped).
Pending Decisions / Key Findings
- Reviewer 2 (v2) issued a FAIL verdict on M2 implementation. Critical and major issues identified:
- PUT Route is non-atomic (Prisma updates to Menu record happen outside transaction block).
- POST Route ignores
payloadandisActivefields on creation. - PATCH translation endpoint lacks TypeBox schema validation.
- Relative imports in routes are missing
.jsextensions under ESM resolution. - GET Route returns a mock object (violating type definition) and 200 OK when menu is not found instead of 404.
- Shared types
Menuinterface is missingisActive. - Spreading translation array bug in MCP tools
applyMenuAddNode. - Bypassing type safety with
tx: any.
- Challenger 1 (v2) issued a FAIL verdict on MCP tools integration:
- Critical omission:
rootImageparameter is missing from/home/ti/.gemini/antigravity/mcp/homaroma_mcp/upsert_menu.jsonschema, andcolumnImage/hoverImageare missing from theitemssub-schema. This makes the new fields unusable via MCP tools.
- Critical omission:
- Challenger 2 (v3) issued a PASS verdict with notes:
- Confirmed the API and MCP JSON-RPC layers validate and store the fields correctly at runtime.
- Warned that the static JSON schemas in
/home/ti/.gemini/antigravity/mcp/homaroma_mcp/are outdated and need field additions to prevent developer confusion. - Identified a duplicate name POST returning 500 instead of 409 Conflict.
- Forensic Auditor (v2) issued a CLEAN verdict.
Remaining Work for Successor
- Spawn a Worker to implement fixes for all 8 review/challenger issues.
- Re-run M2 validation (2 Reviewers, 2 Challengers, 1 Forensic Auditor).
- Once M2 passes, decompose and delegate M3 (Frontend updates in admin, SPA, and website navigation).
Key Artifacts
- ORIGINAL_REQUEST.md — Verbatim user constraints
- BRIEFING.md — Coordination briefing state
- progress.md — checklist and heartbeat logs
- SCOPE.md — Milestones and contracts
- /home/ti/git/homaroma/.agents/reviewer_m2_2_v2/review.md — Detailed review fail feedback
- /home/ti/git/homaroma/.agents/challenger_m2_1_v2/challenge_report.md — Challenger 1 fail feedback
- /home/ti/git/homaroma/.agents/challenger_m2_2_v3/challenge_report.md — Challenger 2 report & notes